Details
Reactor Type | Pressurised Water Reactor (or PWR) |
---|---|
Model | VVER-1200/V-529 |
Owner | Nuclear Power Plants Authority of Egypt |
Operator |
Timeline
Construction Start | Wednesday, 20 July 2022 |
---|
Specifications
Capacity Net | 1100 MWe |
---|---|
Capacity Gross | 1200 MWe |
Thermal Capacity | 3212 MWt |
Design Net Capacity | 1100 MWe |
Operational History
Electricity Supplied (GWh)
Energy Availability Factor (%)
Total Electricity Supplied (GWh)
Reactor History
Year | Reference Unit Power (MWe) | Annual Time Online (Hours) | Electricity Supplied (GWh) | Operation Factor (%) | Energy Availability Annual (%) | Energy Availability Cumulative (%) | Load Factor Annual (%) | Load Factor Cumulative (%) |
---|